Tour Our Office
Plaistow Oral Surgery and Dental Implant Center is excited to be open now. Our office uses the latest in dental technology and is being built with patient comfort and experience in mind. We welcome you.
Reception area looking towards the operatories.

Reception Area.

Dilley Dalley Alley, otherwise known as the sterilization and laboratory.

The latest in Cone Beam Computed Tomography technology, Vatech Green CT.

NFPA 99 Category 1 Medical Gas System.

Prepared for challenging situations we hope to never have.

Cross hallway to opposite site operatories.

Sterilization.

Operatory.

Schedule An Appointment To Our State-of-the-Art Office
Patient view from one of the double window walled operatories.

The inner operatory.

Looking back across to the other side.
Checkout on the other side of the office.

See Where it All Began
This is where we started, it was a computer network company with this being one side of the office. The other side looked like a spaceship, blinds closed with each employee having 6 large monitors in front of them.

Here we are with removal of the prior IT companies equipment.

Before construction the demo must be done to start with a clean slate.

The walls are taking shape with little ghost people streaking around.

A little plumbing in the lab area, PEX tubing sure makes things easier.

When I grew up, we started working young, and luckily the kid feels the same way.

Here is the future Cone Beam Computed Tomography area taking shape.

Sheetrock with the multiple medical gas access panels on the side of an operatory.

Mud, taping and you can see the abundance of work completed in the ceiling with network cables (luckily we could utilize at least 1 item from the previous tenant), electrical, HVAC and medical gas further down the hall.

My interior design skills, or lack thereof, time will tell.

The hallway that connects the two sides of the office full of cabinets getting ready for install.

The laboratory in the background and sterilization getting ready to take shape.

Looking from the treatment area into the reception area with ADA bathroom on the left.

Looking from the reception area down into the treatment area.

The business office moving along.

The other side of the clinic looking down to the nurses niche.

Two of the operatories have 2 walls of windows, please forgive the dust.

The operatory cabinets in progress. The middle section will contain the medical gas system, house monitors etc that will directly download vitals to our Electronic Medical Record for procedures conducted under sedation.
